Skip to main content

Cron expression

0 20 24 MAY 1-5

This cron expression schedules a command to run at 20:00, on day 24 of the month, Monday through Friday, only in May.

At 20:00, on day 24 of the month, Monday through Friday, only in May.

Next runs · UTC

September 2026 · UTC

0 runs

Read more in the dedicated guide: Cron weekdays (Mon-Fri).

What this cron means, field by field

Each field of 0 20 24 MAY 1-5 controls one dimension of the schedule. Hover over any value in the editor above to see its tooltip; the table below summarises the same information.

FieldValueMeansRange / hint
minute0at minute 00-59. The minute(s) of the hour the job will fire.
hour20at hour 200-23. The hour(s) of the day the job will fire (0 = midnight, 23 = 11 PM).
day of month24at day of month 241-31. The day(s) of the month. Use * if you want every day.
monthMAYat month MAY1-12 or JAN-DEC. The month(s). Use * for every month.
day of week1-5from day of week 1 through 50-7 or SUN-SAT (0 and 7 both mean Sunday). Use * for every day of the week.

Next 5 runs

Shown in UTC. Change the timezone in the editor.

Next runs · UTC

  1. Mon 3 May · 20:00in 229d 6h
  2. Tue 4 May · 20:00
  3. Wed 5 May · 20:00
  4. Thu 6 May · 20:00
  5. Fri 7 May · 20:00

Similar cron expressions

Common variations and tweaks of 0 20 24 MAY 1-5.

Where else this cron could be used

The same expression 0 20 24 MAY 1-5 works in:

Examples

  • 0 18 * * *
    Every day at 18:00
  • 0 */5 * * *
    Every 5 hours
  • 0 18 * * 1-5
    Weekdays at 18:00
  • 0 0 1 * *
    Once a month, on the 1st at midnight

Cheatsheet

Full cheatsheet
FieldReq.RangeWildcards
minuteyes0-59, - * /
houryes0-23, - * /
day of monthyes1-31, - * /
monthyes1-12 or JAN-DEC, - * /
day of weekyes0-6 or names; some dialects use 0-7 or 1-7 — see Dialects, - * /

Frequently asked questions

What does the cron expression `0 20 24 MAY 1-5` mean?

at 20:00, on day 24 of the month, Monday through Friday, only in May.

When does `0 20 24 MAY 1-5` run next?

The next runs (UTC): 2027-05-03 20:00; 2027-05-04 20:00; 2027-05-05 20:00; 2027-05-06 20:00; 2027-05-07 20:00.

Is `0 20 24 MAY 1-5` a valid cron expression?

Yes - CronTool's parser accepts this expression and the calendar projects future runs successfully.

Run this cron in production

Stop pasting `0 20 24 MAY 1-5` into a host you also have to babysit.

WordPress, Shopify, Railway, Cloud Run, Vercel, HubSpot, Ghost, your own box. If it answers HTTP, Crontap can drive it on a clock you can read, in the timezone that actually matters, and page you when something breaks.

1.9k+ teams · Free forever tier · No credit card