Skip to main content

Cron expression

*/5 9 4 APR 0,6

This cron expression schedules a command to run every 5 minutes, between 09:00 and 09:59, on day 4 of the month, and on Sunday and Saturday, only in April.

Every 5 minutes, between 09:00 and 09:59, on day 4 of the month, and on Sunday and Saturday, only in April.

Next runs · UTC

September 2026 · UTC

0 runs

Read more in the dedicated guide: Cron every 5 minutes.

What this cron means, field by field

Each field of */5 9 4 APR 0,6 controls one dimension of the schedule. Hover over any value in the editor above to see its tooltip; the table below summarises the same information.

FieldValueMeansRange / hint
minute*/5every 5 minutes0-59. The minute(s) of the hour the job will fire.
hour9at hour 90-23. The hour(s) of the day the job will fire (0 = midnight, 23 = 11 PM).
day of month4at day of month 41-31. The day(s) of the month. Use * if you want every day.
monthAPRat month APR1-12 or JAN-DEC. The month(s). Use * for every month.
day of week0,6at day of week 0, 60-7 or SUN-SAT (0 and 7 both mean Sunday). Use * for every day of the week.

Next 5 runs

Shown in UTC. Change the timezone in the editor.

Next runs · UTC

  1. Sat 3 Apr · 09:00in 198d 17h
  2. Sat 3 Apr · 09:05
  3. Sat 3 Apr · 09:10
  4. Sat 3 Apr · 09:15
  5. Sat 3 Apr · 09:20

Similar cron expressions

Common variations and tweaks of */5 9 4 APR 0,6.

Where else this cron could be used

The same expression */5 9 4 APR 0,6 works in:

Examples

  • 0 18 * * *
    Every day at 18:00
  • 0 */5 * * *
    Every 5 hours
  • 0 18 * * 1-5
    Weekdays at 18:00
  • 0 0 1 * *
    Once a month, on the 1st at midnight

Cheatsheet

Full cheatsheet
FieldReq.RangeWildcards
minuteyes0-59, - * /
houryes0-23, - * /
day of monthyes1-31, - * /
monthyes1-12 or JAN-DEC, - * /
day of weekyes0-6 or names; some dialects use 0-7 or 1-7 — see Dialects, - * /

Frequently asked questions

What does the cron expression `*/5 9 4 APR 0,6` mean?

every 5 minutes, between 09:00 and 09:59, on day 4 of the month, and on Sunday and Saturday, only in April.

When does `*/5 9 4 APR 0,6` run next?

The next runs (UTC): 2027-04-03 09:00; 2027-04-03 09:05; 2027-04-03 09:10; 2027-04-03 09:15; 2027-04-03 09:20.

Is `*/5 9 4 APR 0,6` a valid cron expression?

Yes - CronTool's parser accepts this expression and the calendar projects future runs successfully.

Run this cron in production

Stop pasting `*/5 9 4 APR 0,6` into a host you also have to babysit.

WordPress, Shopify, Railway, Cloud Run, Vercel, HubSpot, Ghost, your own box. If it answers HTTP, Crontap can drive it on a clock you can read, in the timezone that actually matters, and page you when something breaks.

1.9k+ teams · Free forever tier · No credit card